A Groundwork company - serving Richmond, CA
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Berkeley, CA

ADU Site Prep & Utilities in Berkeley - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Richmond
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Berkeley: What It Covers and What It Costs

ADU site prep and utilities in Berkeley means getting a buildable, serviced pad ready for a new detached or attached unit: excavation, grading and drainage, foundation formwork, and then the underground runs for water, sewer, gas and electrical up to the structure. A typical detached-unit package runs $45,000 – $130,000 for the prep and utility scope, and the ground phase alone usually takes three to six weeks once permits clear. Call (833) 700-4611 and we’ll walk your lot and give you a fixed, line-item number.

construction workers installing fiber cement siding on a new home addition in Berkeley, CA

Call (833) 700-4611

If you’re still sorting out the wider build, this work slots into a full Home Additions & ADU in Berkeley scope, and our Home Additions & ADU service covers the structure that follows the pad.

How We Sequence the Work, Stage by Stage

A single-story rear room addition with tall windows and a new patio

Site prep isn’t a single crew showing up with a shovel. It’s a sequence, and the gaps between stages are inspections. Here’s what a Berkeley job actually looks like day to day.

Stage 1: Site walk and utility locating (days 1 – 2)

We mark the building footprint, find the existing sewer lateral and water main at the street, and call for utility locating before anyone digs. On Berkeley lots with old growth and unrecorded lines, this is where surprises surface. You decide the unit’s final siting and whether the gas line runs to the unit or stays electric-only. Allow up to two weeks of lead time for locates on busy streets.

Stage 2: Excavation, grading and drainage (days 3 – 7)

A small excavator strips topsoil and cuts the pad to grade, holding the finish floor above the seasonal water table. We build the drainage now, not later: footing drains, a grading plan that sheds water away from both the new unit and your house, and a tie-in to the storm system where the site allows. Your decision here is drainage strategy – gravity to the street versus a dry well or sump.

Stage 3: Foundation and underslab utilities (days 8 – 18)

Forms go up, the plumbing and electrical conduits are laid under the slab and stubbed where the unit’s fixtures and panel will land, then the concrete pours. Rough-in inspection happens before the pour, so the ground has to be signed off first. This is the stage where moving a bathroom after the fact costs real money – get fixture layout locked here.

Stage 4: Utility trenching to the main (days 19 – 28)

Water, sewer, gas and electrical each get their own trench and inspection. Sewer needs its slope verified; the gas line gets pressure-tested; the electrical conduit runs from your main panel or the meter to the new subpanel location. You choose the panel amperage and whether a separate meter is wanted.

Stage 5: Backfill, compaction, final grade and inspection (days 29 – 42)

Trenches get backfilled in lifts and compacted, then the site is graded to drain and the utility inspections close out. You’ll want to know where the cleanouts and shutoffs sit, so we mark them before the final walk. From here the build moves vertical.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make

Most of the dollars on a prep-and-utilities job come down to a handful of decisions. Here’s the honest trade-off on each:

Construction workers framing walls for a home addition or ADU project. in Berkeley, CA
  • Foundation type: A slab-on-grade is the lowest-cost and fastest option (roughly $8 – $14 per square foot of footprint) but puts every pipe under concrete. A raised or stem-wall foundation costs more up front and makes future plumbing work far easier. If the lot slopes, the crawlspace option tends to pay for itself.
  • Sewer strategy: Gravity to the street main is cheapest when the main is low enough. If the lot sits below the main’s grade, a lift pump or grinder station adds a real cost and a machine that needs maintaining. Verify the elevation early.
  • Electrical service: Upgrading the main panel to carry the new unit’s load is common on older Berkeley homes with 100-amp service. A separate meter is convenient for renters and future resale; a subpanel off the house is cheaper.
  • Drainage: Dry well versus surface discharge to the street versus a sump system. On hillside lots, retention and a proper swale usually cost more but keep the winter water off your foundation.
  • Utility routing: Running lines along a garage wall versus trenching through a finished yard or past established trees. Tree protection and root barriers are a real line item when a mature oak or redwood is in the way.

What ADU Site Prep & Utilities Costs in Berkeley, CA

A framer checking new wall framing on a home addition

The ground-and-utilities scope for a Berkeley ADU typically costs $45,000 – $130,000. That’s the prep-and-service portion of a larger build, and where a job lands depends on these five variables:

  • Lot and slope: A flat, open backyard is the low end. A hillside lot with retaining, haul-off of excess dirt and stepped grading pushes toward the top.
  • Distance to existing services: Every extra foot of trench from the street main or your house’s panel adds cost. A unit at the back of a deep lot needs a longer run.
  • Foundation choice: Slab versus raised, and whether the footprint needs extra footings for a heavier roof or second level.
  • Utility upgrades: A panel swap, new meter, gas line pressure work, or a lift station for sewer.
  • Permit and inspection scope: More trenching, more inspections, more inspections fees. Berkeley scrutinizes more here than many neighboring cities.

A written estimate from us breaks out each of these lines: excavation and haul-off, drainage, foundation, trenching, utility connections and inspection fees. What it doesn’t include by default is the wider build above the pad, landscape restoration, or the interior fixtures. Upfront pricing is the rule, so the number you sign is the number you pay – no change orders invented mid-job. We also credit $1,000 off projects over $10,000 and offer 0% financing for 18 months to spread the ground phase.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Berkeley Homes Specifically Do to This Job

Berkeley’s permitting and code reality shapes this work more than the climate does. Nearly every ADU here runs through a thicket of historic-preservation review, some of the country’s strictest green-building requirements under Berkeley Built Green, and seismic mandates that often reach the lot before we do. On early-1900s Craftsman and brown-shingle homes in the Elmwood and the north side, we routinely find original knob-and-tube wiring and galvanized plumbing that forces utility upgrades during the trench – so budget for code corrections, not just a connection. In the Berkeley Hills, narrow winding streets and the 1991 Firestorm legacy mean fire-resistant construction and defensible-space details that change how the lot is prepped and how materials get hauled up tight roads. Down in the flatlands, post-war stucco boxes often have shallow service laterals that need upsizing before an ADU can tie in. We cover Berkeley and the surrounding ZIPs 94702, 94703 and 94712 with the same crew, and homeowners with a driveway to rebuild often pair this with Concrete Driveways & Concrete Work in Berkeley to keep equipment access clean, or Paver Driveways in Berkeley when they want the finished look.

Serving Berkeley, CA – Our Local Coverage Area

We serve Berkeley and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: ADU Site Prep & Utilities in Berkeley

A new multi-panel patio door opening a kitchen to the patio

Get a Free On-Site Estimate for Your Berkeley ADU

Call (833) 700-4611 and a live person picks up, day or night. We’ll schedule a free on-site visit, walk the lot, check your existing sewer and panel capacity, and hand you a written line-item estimate for the prep and utilities scope – the same numbers you’ll pay. From foundation to finish line, one contractor holds the whole thing, backed in writing.

Written by the team at Groundwork Construction Co.

Why Berkeley Chooses Groundwork Construction Co. of Richmond

We set the standard for ADU site prep & utilities in Berkeley.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Berkeley

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Berkeley Customers Say

Trusted by homeowners across Berkeley and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new roof with clean valleys and new flashingA new stained cedar privacy fenceA new paver patio with a seat wall and fire pit

More services in Berkeley

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Richmond

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Richmond team

A local vetted partner works across Richmond and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Berkeley?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Berkeley.

(833) 700-4611

Request a Free Estimate in Berkeley

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch