







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Rodeo, CA: What the Job Really Involves
Cabinets & countertops in Rodeo typically runs $14,000 – $45,000 for new cabinetry and stone or quartz tops together, with most single-family jobs landing in the $18,000 – $28,000 middle. Cabinet installation alone runs $4,000 – $13,000; countertops $2,000 – $6,500. Plan on three to four weeks from demolition to final caulk when the layout stays put, longer if plumbing or electrical moves. Call (833) 700-4611 for a free on-site estimate and a written line-item quote.

How the Work Moves, Stage by Stage

The sequence matters more than the calendar. Here’s what actually happens, and where you make the decisions.
Stage 1: Measure and template (days 1 – 2)
We measure the room, check the walls for plumb and square, and photograph the existing plumbing and electrical so nobody cuts a cabinet box over a live wire later. Older Rodeo homes frequently have out-of-square corners, so we note where a filler strip will be needed. You approve the cabinet layout and door style here. Nothing gets ordered until that sign-off.
Stage 2: Demolition and rough-in (days 3 – 5)
Old cabinets, countertops, and backsplash come out, along with any damaged drywall behind them. The wall is opened up, and if the plan calls for moved plumbing, a new outlet for a microwave, or a gas line for a range, that rough work happens now, before cabinets arrive. This is the stage most likely to turn up a surprise in mid-century housing: galvanized supply lines, cloth wiring, or a soft subfloor from a slow leak. You get a call before we add anything to the scope.
Stage 3: Cabinet install (days 6 – 10)
Uppers go up first, leveled and screwed to studs, then bases. We shim and scribe to the wall rather than assuming the wall is flat, which is why old houses take longer than new ones. Doors and drawers get adjusted after the boxes are set. You confirm hardware placement and pulls at this point.
Stage 4: Template and countertop fabrication (days 10 – 18)
Once the base cabinets are set, the countertop fabricator templates the actual room, then cuts and finishes the slab or sheet in their shop. This is the waiting period of the whole job, and it’s the reason countertops come after cabinets, never before. If you’ve chosen a quartz or natural stone slab, you’ll want to pick it before templating so the fabrication slot isn’t delayed.
Stage 5: Set, connect, and punch list (days 18 – 24)
The tops get set and seamed, the sink and faucet go in, the dishwasher is reconnected, and the sink base is drilled for the drain. We run water, check for leaks, and walk the job with you. Anything on the punch list gets fixed before final payment. Most jobs finish clean in a single visit at this stage.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Pick Between
Almost every decision in this job comes down to how long you want it to last versus what you want to spend. Here’s the honest version of each.
- Stock vs. semi-custom cabinets. Stock is cheaper and faster, but it comes in set sizes and forces compromises on odd walls. Semi-custom lets you match a Rodeo home’s irregular dimensions and costs meaningfully more. KraftMaid is a solid middle path; the trade-off is a longer lead time than stock.
- Plywood vs. particleboard boxes. Plywood holds up far better in a bay-moisture climate and resists swelling if a sink leaks. Particleboard is common in budget lines and swells when wet. Worth the upgrade in a humid shoreline house.
- Quartz vs. granite vs. laminate. Quartz is non-porous and low-maintenance; granite is natural and heat-tolerant but needs sealing; laminate is the budget option and the one most likely to show seam wear. Cambria is a reasonable quartz name to look at.
- Full overlay vs. inset doors. Full overlay is standard and affordable. Inset is the craftsman look and costs more because the tolerances are tighter.
- Soft-close hardware. Cheap to add at install, expensive to retrofit. Specify it upfront.
What Cabinets & Countertops Costs in Rodeo, CA
The honest range for cabinets and countertops together is $14,000 – $45,000 in Rodeo. A smaller update with stock cabinets and laminate tops sits near the bottom. A full semi-custom job with quartz, an island, and moved plumbing lands near the top. Five things move the number:

- Room size and cabinet count. Linear feet of cabinetry drives both materials and labor.
- Existing condition. Out-of-square walls, bad wiring, or a soft subfloor add labor before anything new goes in.
- Relocating plumbing, gas, or electrical. Moving a sink or range means rough-in work and, often, a permit.
- Material grade. The gap between laminate and quartz is real money; so is the gap between stock and semi-custom boxes.
- Permit scope. A like-for-like swap may not need one. Moving plumbing, gas, or structure usually does.
A written estimate from us lists every line: cabinets, tops, demo, disposal, plumbing, electrical, permit fees, and labor. What’s typically not included is appliance cost, structural changes discovered mid-job, and any work the homeowner chooses to add later. Upfront pricing means the number you see is the number you pay, with no change orders unless you approve the scope change first.
See the difference
Before
After
Before
After
Before
AfterWhat Rodeo Homes Specifically Do to This Job
Rodeo is a refinery town on San Pablo Bay, and that shows up in the work. A lot of the housing here dates to the 1940s through the 1970s, so a cabinet job often turns into a wiring and plumbing update once the wall opens up. Salt air and refinery-adjacent conditions speed corrosion on fasteners and hinges, which is why we spec corrosion-resistant hardware on jobs near the shoreline. Marine moisture also means we check the subfloor and the wall behind the sink for rot before we set new cabinets, because a leak that’s been running for years will show up when the old base comes out. Materials hauling is another reality: Rodeo is reached mainly via I-80 and Highway 4, and the hillside-and-shoreline geography constrains staging, so we plan deliveries around it. We work across Rodeo ZIP 94572 and the surrounding area, and neighbors often ask us about pairing this with a Garage Conversion ADU in Rodeo or a New Detached ADU in Rodeo while the trades are already on site. If the cabinets and tops are part of a bigger scope, see our Kitchen Remodeling in Rodeo page or the Kitchen Remodeling service hub, and our Rodeo service-area page covers what else we do here.
Serving Rodeo, CA – Our Local Coverage Area
We serve Rodeo and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Rodeo

Most jobs take three to four weeks from demolition to final walkthrough, with countertop fabrication as the long pole at eight to ten days. Add time if plumbing or electrical is moving. Call (833) 700-4611 for a timeline based on your actual kitchen.
A straight cabinet and countertop swap usually doesn’t require one; moving plumbing, gas lines, or electrical generally does. We pull the permits required for your scope and see the inspections through. Call us and we’ll tell you what your job needs.
Yes, and most homeowners choose to. Keeping the sink, range, and walls where they are cuts both cost and time, since no rough-in or structural work is involved. If you want a different layout, we’ll show you what moving each item adds.
Expect $14,000 – $45,000 for cabinets and countertops together, with cabinet installation at $4,000 – $13,000 and countertops at $2,000 – $6,500. The range reflects material grade, room size, and whether anything moves. Call (833) 700-4611 for an exact quote; estimates are free.
Every cabinets & countertops project comes with our 730-Day Done Right Promise, one of the longest workmanship guarantees in the residential construction space. If it’s not done right, we make it right. Our technicians have up to 12 years of experience, and every one is background-checked and arrives in uniform.
Get a Free Cabinets & Countertops Estimate in Rodeo
Call (833) 700-4611 to schedule a free on-site estimate for cabinets & countertops in Rodeo. A live person answers around the clock, so you won’t land in voicemail. We’ll measure the room, walk through the layout options, and hand you a written line-item quote with upfront pricing and no surprises. Financing at 0% for 18 months is available, and projects over $10,000 take $1,000 off. From foundation to finish line, built to last, backed in writing.
Written by the team at Groundwork Construction Co.












