A Groundwork company - serving Richmond, CA
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Martinez, CA

ADU Site Prep & Utilities in Martinez - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Richmond
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Martinez, CA: What It Costs and What’s Involved

ADU site prep and utilities in Martinez typically run $45,000 – $130,000 for the sitework, trenching, foundation, grading, and utility connections that come before the unit itself goes up. Site prep alone (grading, excavation, foundation, retaining) usually takes 3 – 6 weeks; running electrical, gas, water, and sewer adds another 2 – 4 weeks and often depends on how far the tie-ins are from the main. Call (833) 700-4611 and we’ll walk the lot with you and give you a written number.

construction workers installing fiber cement siding on a new home addition in Martinez, CA

Call (833) 700-4611

This is the part of an ADU project most homeowners underestimate. In Martinez, the site work is not a formality – the wind, the slopes, and the age of the utilities in the ground make it the stage where budgets get decided.

How the Site Prep and Utility Work Actually Unfolds

A garage converted into a guest room and home office

We break a Martinez ADU site job into five stages. Here’s what happens and when.

  • Stage 1 – Site walk and utility locate (day 1). We call for utility marking before anything gets dug, then walk the lot with you to confirm the building pad location, the grading limits, and where the sewer lateral and water main actually sit. In older Martinez homes, that lateral is often clay or cast iron, and what we find here changes everything downstream.
  • Stage 2 – Demolition, clearing, and grading (days 2 – 7). Any old concrete, sheds, or landscaping come out. Then we cut and fill to grade. On the hillside lots above downtown, this is where retaining walls and slope stabilization enter the picture, and it can stretch the schedule by a week or more depending on how much dirt has to move.
  • Stage 3 – Trenching and utility runs (days 8 – 15). We trench for electrical conduit, water, gas, and sewer, then lay the lines and prep them for inspection. The homeowner decision here: where the meter and the panel land, and whether you want gas extended to the unit or an all-electric setup.
  • Stage 4 – Foundation and anchor system (days 16 – 25). Forms, rebar, and pour, plus the wind-strapping and anchor bolts specified for the wind corridor. You’ll pick whether you’re on a slab, a stem-wall crawl, or a raised foundation, which depends on slope and drainage.
  • Stage 5 – Inspections and backfill (days 26 – 30). Rough utility inspections, then backfill and compaction. You sign off on the as-built utility layout, and the site is ready for the unit itself, which is where the wider work begins – see Home Additions & ADU in Martinez for the construction scope that follows.

We pull the permits, schedule the inspections, and don’t hand the site back until it passes. That’s covered by the 730-Day Done Right Promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Make on Site and Utilities

  • Foundation type. Slab-on-grade is the least expensive and simplest to build on; stem-wall crawl gives you access for future plumbing repairs; raised pier-and-beam suits sloped lots but costs more and needs bracing for wind. On a steep Alhambra Valley lot, the slope usually decides for you.
  • Utility routing. Trenching fresh lines is cleaner and cheaper than tying into old ones, but if the existing sewer lateral is in good shape, a tie-in saves money. Old galvanized water lines in downtown Victorian stock almost always get replaced.
  • Electrical service. A subpanel off the main house is standard; a separate meter costs more upfront but simplifies future billing if you plan to rent the unit.
  • Wind-rated materials. Anchor bolts, hold-downs, and shear paneling are specified for the Carquinez wind exposure. Not optional here, and skipping them is the kind of shortcut that shows up on an inspection report.
  • Drainage and retaining. French drains, swales, and retaining walls cost more but protect the foundation on sloped lots. Skipping them is how slope failures start.

If your ADU needs exterior doors or windows after the site is prepped, we source from ES Windows and Therma-Tru, both rated for the wind loads this corridor throws at a building.

What ADU Site Prep & Utilities Costs in Martinez, CA

A framer checking new wall framing on a home addition

For Martinez, expect $45,000 – $130,000 for site prep and utilities. Where you land in that range depends on five things:

  • Slope and grading volume. A flat lot on the flats is at the low end. A hillside lot needing cut, fill, and a retaining wall runs to the high end.
  • Utility distance and condition. If the sewer main is 60 feet away and clay, that’s a big line item. If it’s 15 feet and PVC, it’s minor.
  • Existing underground condition. Knob-and-tube wiring or galvanized plumbing in an older Martinez home means bringing things up to current code while you’re already in the ground.
  • Foundation type. Slab is cheapest; raised pier-and-beam on a slope adds cost.
  • Permit scope. Hillside grading plans get extra scrutiny at Martinez City Hall, and that plan-check time can add a few weeks and a modest fee bump.

Your written estimate itemizes grading, trenching, foundation, utility runs, permits, and inspections. What’s typically not included: the ADU structure itself, finishes, and any landscaping beyond rough grade. We put the number in writing and it doesn’t move unless you change the scope. Financing at 0% for 18 months is available, and projects over $10,000 get $1,000 off.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Martinez Homes Specifically Do to This Job

Martinez sits at the Carquinez Strait, a wind gap where the Delta meets the Bay. Afternoon gusts during construction season are a real constraint: high-wind days shut down crane work and drywall, and wind-driven rain finds every poorly flashed opening. Contractors here schedule around the gusts and specify wind-rated materials. That exposure is why our site work includes anchor bolts, hold-downs, and shear bracing even before the unit goes up.

Construction workers framing walls for a home addition or ADU project. in Martinez, CA

The housing stock matters too. Downtown Victorians, mid-century ranch tracts on the flats, and custom hillside homes each come with a different permit path. In older stock we regularly find knob-and-tube wiring and galvanized plumbing once we open a trench. And Martinez City Hall reviewers scrutinize hillside grading and seismic retrofits more closely than surrounding cities, because of the slope failures above downtown in the 1980s. Budget extra time for plan check if your lot is on a slope. We handle the submittal and work with that reviewer directly for customers throughout Martinez and zip 94553.

Serving Martinez, CA – Our Local Coverage Area

We serve Martinez and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – ADU Site Prep & Utilities in Martinez

A new wood side gate with black hardware

Get a Free Estimate for ADU Site Prep & Utilities in Martinez

Call (833) 700-4611 to schedule a free on-site estimate for ADU site prep and utilities in Martinez. We’ll walk the lot, call for utility locates, and give you a written line-item number for grading, foundation, trenching, utility runs, and permits. Calls are answered by a live person 24/7, no voicemail. Technicians are background-checked and uniformed, and the number you see is the number you pay.

Written by the team at Groundwork Construction Co.

Why Martinez Chooses Groundwork Construction Co. of Richmond

We set the standard for ADU site prep & utilities in Martinez.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Martinez

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Martinez Customers Say

Trusted by homeowners across Martinez and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gate

More services in Martinez

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Richmond

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Richmond team

A local vetted partner works across Richmond and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Martinez?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Martinez.

(833) 700-4611

Request a Free Estimate in Martinez

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch