ADU Site Prep & Utilities in Martinez, CA: What It Costs and What’s Involved
ADU site prep and utilities in Martinez typically run $45,000 – $130,000 for the sitework, trenching, foundation, grading, and utility connections that come before the unit itself goes up. Site prep alone (grading, excavation, foundation, retaining) usually takes 3 – 6 weeks; running electrical, gas, water, and sewer adds another 2 – 4 weeks and often depends on how far the tie-ins are from the main. Call (833) 700-4611 and we’ll walk the lot with you and give you a written number.

This is the part of an ADU project most homeowners underestimate. In Martinez, the site work is not a formality – the wind, the slopes, and the age of the utilities in the ground make it the stage where budgets get decided.
How the Site Prep and Utility Work Actually Unfolds

We break a Martinez ADU site job into five stages. Here’s what happens and when.
- Stage 1 – Site walk and utility locate (day 1). We call for utility marking before anything gets dug, then walk the lot with you to confirm the building pad location, the grading limits, and where the sewer lateral and water main actually sit. In older Martinez homes, that lateral is often clay or cast iron, and what we find here changes everything downstream.
- Stage 2 – Demolition, clearing, and grading (days 2 – 7). Any old concrete, sheds, or landscaping come out. Then we cut and fill to grade. On the hillside lots above downtown, this is where retaining walls and slope stabilization enter the picture, and it can stretch the schedule by a week or more depending on how much dirt has to move.
- Stage 3 – Trenching and utility runs (days 8 – 15). We trench for electrical conduit, water, gas, and sewer, then lay the lines and prep them for inspection. The homeowner decision here: where the meter and the panel land, and whether you want gas extended to the unit or an all-electric setup.
- Stage 4 – Foundation and anchor system (days 16 – 25). Forms, rebar, and pour, plus the wind-strapping and anchor bolts specified for the wind corridor. You’ll pick whether you’re on a slab, a stem-wall crawl, or a raised foundation, which depends on slope and drainage.
- Stage 5 – Inspections and backfill (days 26 – 30). Rough utility inspections, then backfill and compaction. You sign off on the as-built utility layout, and the site is ready for the unit itself, which is where the wider work begins – see Home Additions & ADU in Martinez for the construction scope that follows.
We pull the permits, schedule the inspections, and don’t hand the site back until it passes. That’s covered by the 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Make on Site and Utilities
- Foundation type. Slab-on-grade is the least expensive and simplest to build on; stem-wall crawl gives you access for future plumbing repairs; raised pier-and-beam suits sloped lots but costs more and needs bracing for wind. On a steep Alhambra Valley lot, the slope usually decides for you.
- Utility routing. Trenching fresh lines is cleaner and cheaper than tying into old ones, but if the existing sewer lateral is in good shape, a tie-in saves money. Old galvanized water lines in downtown Victorian stock almost always get replaced.
- Electrical service. A subpanel off the main house is standard; a separate meter costs more upfront but simplifies future billing if you plan to rent the unit.
- Wind-rated materials. Anchor bolts, hold-downs, and shear paneling are specified for the Carquinez wind exposure. Not optional here, and skipping them is the kind of shortcut that shows up on an inspection report.
- Drainage and retaining. French drains, swales, and retaining walls cost more but protect the foundation on sloped lots. Skipping them is how slope failures start.
If your ADU needs exterior doors or windows after the site is prepped, we source from ES Windows and Therma-Tru, both rated for the wind loads this corridor throws at a building.
What ADU Site Prep & Utilities Costs in Martinez, CA

For Martinez, expect $45,000 – $130,000 for site prep and utilities. Where you land in that range depends on five things:
- Slope and grading volume. A flat lot on the flats is at the low end. A hillside lot needing cut, fill, and a retaining wall runs to the high end.
- Utility distance and condition. If the sewer main is 60 feet away and clay, that’s a big line item. If it’s 15 feet and PVC, it’s minor.
- Existing underground condition. Knob-and-tube wiring or galvanized plumbing in an older Martinez home means bringing things up to current code while you’re already in the ground.
- Foundation type. Slab is cheapest; raised pier-and-beam on a slope adds cost.
- Permit scope. Hillside grading plans get extra scrutiny at Martinez City Hall, and that plan-check time can add a few weeks and a modest fee bump.
Your written estimate itemizes grading, trenching, foundation, utility runs, permits, and inspections. What’s typically not included: the ADU structure itself, finishes, and any landscaping beyond rough grade. We put the number in writing and it doesn’t move unless you change the scope. Financing at 0% for 18 months is available, and projects over $10,000 get $1,000 off.
See the difference
Before
After
Before
After
Before
AfterWhat Martinez Homes Specifically Do to This Job
Martinez sits at the Carquinez Strait, a wind gap where the Delta meets the Bay. Afternoon gusts during construction season are a real constraint: high-wind days shut down crane work and drywall, and wind-driven rain finds every poorly flashed opening. Contractors here schedule around the gusts and specify wind-rated materials. That exposure is why our site work includes anchor bolts, hold-downs, and shear bracing even before the unit goes up.

The housing stock matters too. Downtown Victorians, mid-century ranch tracts on the flats, and custom hillside homes each come with a different permit path. In older stock we regularly find knob-and-tube wiring and galvanized plumbing once we open a trench. And Martinez City Hall reviewers scrutinize hillside grading and seismic retrofits more closely than surrounding cities, because of the slope failures above downtown in the 1980s. Budget extra time for plan check if your lot is on a slope. We handle the submittal and work with that reviewer directly for customers throughout Martinez and zip 94553.
Serving Martinez, CA – Our Local Coverage Area
We serve Martinez and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – ADU Site Prep & Utilities in Martinez

Site prep and utilities take 5 – 8 weeks on most Martinez lots, with slope and utility distance being the big swing factors. Plan for the longer end on hillside properties, and call (833) 700-4611 for a site-specific timeline.
Yes – grading, foundation, and utility work all require permits, and hillside grading plans get closer review at Martinez City Hall. We pull the permits and schedule the inspections as part of the job, and the 730-Day Done Right Promise backs the work.
Sometimes, but it depends on where the sewer lateral and water main sit and what condition they’re in. If you’re tying into old galvanized or clay lines, replacement is usually the better call, and our technicians have up to 12 years of experience reading what’s in the ground before committing.
Rates run $45,000 – $130,000, driven by slope, utility distance, foundation type, and permit scope. Call (833) 700-4611 for an exact written quote. Estimates are free.
All of it is covered by the 730-Day Done Right Promise – if anything isn’t done right, we make it right. That covers grading, foundation, utility runs, and the inspections that go with them.
Homeowners often pair this with Concrete Driveways & Concrete Work in Martinez once the site pad and access routes are cut, or Paver Driveways in Martinez if they want a finished approach to the unit. It’s all part of our Home Additions & ADU service.
Get a Free Estimate for ADU Site Prep & Utilities in Martinez
Call (833) 700-4611 to schedule a free on-site estimate for ADU site prep and utilities in Martinez. We’ll walk the lot, call for utility locates, and give you a written line-item number for grading, foundation, trenching, utility runs, and permits. Calls are answered by a live person 24/7, no voicemail. Technicians are background-checked and uniformed, and the number you see is the number you pay.