Cabinets & Countertops in Piedmont, CA: What the Job Actually Involves
Cabinets & countertops in Piedmont, CA typically run $14,000 – $45,000 and take about three to five weeks from demo to final caulk, depending on whether we’re keeping the layout or moving plumbing and electrical. The work is a sequence: tear-out, cabinet set and level, template, stone or surfacing fabrication, install, then backsplash. Call (833) 700-4611 for a free on-site estimate and a written line-item quote.

First, the failure we see most in Piedmont kitchens

Walk into a 1920s Craftsman off Highland Avenue or a Tudor near Wildwood Gardens and the kitchen usually tells the same story. Original fir cabinets that have been painted four times, doors that no longer sit square because the walls behind them have moved, and a laminate or tile counter that was trendy in 1987. The drawers stick in July and swell in January. Somebody cut the cabinet back out to fit a dishwasher in the 1990s and never closed it up properly.
That’s the job. It isn’t a cosmetic swap, and treating it like one is how remodels go sideways. In park-like, built-out Piedmont, almost every kitchen project is renovation work inside an old house, and the cabinets and counters have to be fitted to walls that are out of plumb, floors that are out of level, and lath-and-plaster that doesn’t respond like drywall. If the wider scope grows, that’s part of a full Kitchen Remodeling in Piedmont, and the same crew carries it.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
How we run a cabinets and countertops project, stage by stage
Five stages. Here’s what happens and what you’ll be deciding at each one.
Stage 1: Site measure and layout (day 1, about 2 hours)
We measure the actual room, not the drawings. Every wall gets checked for plumb, every corner for square, and we photograph the existing plumbing and electrical so nothing is a surprise on demo day. You decide the layout at this point: keep the sink and range where they are, or move them. Keeping them is a real cost saver and often the right call in a narrow Piedmont galley. Moving the sink means new drain and supply lines and usually a permit.
Stage 2: Order, lead time, and final selections (2 to 5 weeks of waiting)
This is the quiet stretch where nothing happens in your house. Semi-custom cabinets usually land in 4 to 6 weeks; stock cabinets can arrive in 10 days. Stone slabs get selected at the yard and reserved, because a slab you love today may be gone next month. You’ll lock in door style, finish, box construction, hardware, sink, faucet, and edge profile. Decide all of it now, in this window, not during install.
Stage 3: Demo and prep (2 to 3 days)
Old cabinets and counters come out. We protect the floors and seal off the work area, because dust travels through an old house. Any dry rot or water damage behind the sink gets exposed and repaired now. If we’re relocating the sink, this is when the plumber and electrician rough in and the inspection happens. You don’t need to decide anything here, but you’ll want to be reachable if something unexpected turns up behind a wall.
Stage 4: Cabinet install (2 to 4 days)
Boxes get set, shimmed, and leveled against those out-of-square walls, then screwed into studs. Doors, drawers, and hardware go on and get adjusted. Crown and filler pieces close the gaps between cabinet and ceiling and cabinet and wall. You’ll walk it with us before we call it done, and that’s the moment to flag a door that rubs or a drawer that doesn’t glide.
Stage 5: Template, fabricate, install, and backsplash (7 to 12 days total)
Your countertops get templated on site so the stone or surfacing machine-cuts to your actual room. Slab work goes out for cutting and polishing, typically 4 to 7 days. Counter install is a day, then plumbing hookup, then the backsplash tile over the next 2 to 3 days. Final caulk and clean on day 12 or so. You’ll pick the backsplash tile and grout color at the start of this stage.
The options you’ll choose between
This is where the real money gets decided, and where it pays to know the trade-offs before the catalog gets opened.
- Stock vs. semi-custom cabinets. Stock comes in fixed widths and finishes and lands fast; perfect if your room is reasonably square. Semi-custom lets you dial width, depth, and interior layout to your actual kitchen, which matters in a 1928 house where nothing is standard. Full custom is for a very specific vintage match.
- Cabinet box construction. Plywood boxes hold up over decades; particleboard is cheaper and less forgiving of a Piedmont house’s seasonal movement. There’s no hidden trick here, it’s a longevity question.
- Natural stone vs. engineered quartz vs. porcelain slab. Quartz is non-porous and forgiving, and the everyday favorite. Granite and marble carry character but need sealing and, for marble, some acceptance of etching. Porcelain slab is the toughest of the three and takes a modern look.
- Edge profile and slab thickness. A standard eased edge is included in most quotes. Mitered or waterfall edges on an island carry real fabrication cost, so factor that in early.
- Undermount vs. drop-in sink. Undermount is cleaner and easier to clean around. It costs more and needs the counter cut to spec.
- Drawers vs. doors with rollouts. Drawers cost more up front and are nearly always the right call for base cabinets. You’ll use them every day.
See the difference
Before
After
Before
After
Before
AfterWhat Cabinets & Countertops costs in Piedmont, CA
The full job lands between $14,000 and $45,000. Line items:

- Cabinet installation: $4,000 – $13,000
- Countertop installation: $2,000 – $6,500
- Kitchen island installation: $3,000 – $10,000
- Backsplash installation: $800 – $2,500
What pushes a job toward the top of that range? Four things. Size and layout of the kitchen. Material grade: stock cabinets and quartz land low; semi-custom and natural stone push high. Moving plumbing or electrical to relocate the sink, range, or island adds real cost. Existing condition: a Piedmont house with soft or out-of-level floors, or dry rot behind the counter, adds repair time. Permits and design review scope can add a couple thousand more if the project touches structure.
A written line-item estimate from us includes cabinets, counters, labor, disposal, and the inspection-required work, and it’s fixed. It doesn’t include appliances, lighting beyond the under-cabinet wiring, or structural changes beyond what’s quoted. If it’s not on the page, we’ll tell you instead of adding it later.
What Piedmont homes specifically do to this job

Piedmont is a built-out, park-like East Bay enclave of mostly pre-war single-family homes, and that fact shapes every kitchen project we run here. The 1910s – 1930s Craftsman, Tudor, and Mediterranean houses carry original lath-and-plaster, early or knob-and-tube wiring, and unretrofitted framing. So the cabinets and counters get fitted to walls that have been moving for a century, and any plumbing or electrical work inside the wall has to be done right the first time because reopening a plaster wall is expensive.
Access is part of the job too. Narrow hillside lots in the 94620 ZIP mean staging is tight and neighbor relations matter. The city’s design-review-minded permit process can shape the project schedule as much as the construction. And the wet winters mean interior kitchen work runs the calendar we plan around, because exterior staging slows everything down.
Serving Piedmont, CA – Our Local Coverage Area
We serve Piedmont and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Cabinets & Countertops in Piedmont
Three to five weeks of active work, not counting material lead time, which can add 2 to 6 weeks before the first truck arrives. Call (833) 700-4611 for a schedule estimate built around your cabinet order date.
No, if you’re keeping the layout and replacing materials in the same footprint. Yes, if you’re moving plumbing, electrical, or load-bearing structure, because the work is inspected. We pull the permits and pass inspection as part of the job.
Sometimes, yes. If the boxes are solid and the doors aren’t warped, keeping them and replacing the counters saves $4,000 – $13,000. We’ll tell you honestly which path is right for your kitchen.
No. Our estimate is fixed, and the number you see is the number you pay. The only exception is hidden damage found once we open a wall, like dry rot or old wiring, and we quote that to you before proceeding.
Every project is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That covers workmanship on cabinet setting, counter fabrication, and backsplash install.
Get a free estimate for your Piedmont kitchen

Call (833) 700-4611 to schedule a free on-site estimate for cabinets & countertops in Piedmont. We’ll measure the room, check for out-of-square walls, and hand you a written line-item quote with fixed pricing. No automated phone tree, a live person answers around the clock. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off.
Written by the team at Groundwork Construction Co.